Equipment introduction:
1. Production capacity: 10 tons-20 tons/24 hours
2. Equipment size: 12500*2400*3900 (*2)
3. Conditions of use: the ambient temperature does not exceed +40℃, not lower than -10℃, well ventilated and flat ground
4. Power requirements: three-phase 380V50HZ
5. The total installed power is 60KW.
Container Cyanide Can Be Divided Into 3 Parts
1. Crusher Part
2. Leaching Part
For the cyanide plant, the ore size should be 200mesh of 95%, the recovery rate is around 95%. Our 10TPD plant with one ball mill, the size will be 200mesh of 60-70%, the recovery rate will be around 70-80%.
3. Carbon Adsorption Melting Part
1000KG carbon will be loaded with 5-6KG gold.
For our concentrator, the production capacity is 10 tons, if the original gold content is 10g/ton, the gold is 100g/day. The amount of carbon we use every day is 100KG (500g). The gold-containing carbon is tested every day. When the gold content reaches 5-6KG/ton (about 5-6 days), the carbon needs to be taken out.
Contact:NIKO
EARTH TO SUN MINERAL PROCESSING EXPERT
whatsapp:+8613183398111
wechat:
Email: